Canadian Electrical Code
Rule 2-308 3
2-308 Working space around electrical equipment
The working space required by Subrule 1 exists in addition to the distinct space required for the mechanical operation of drawout-type equipment (whet...
Unlock the Full Rule Analysis
This rule has been fully audited and analyzed. Log in to ask Henri for exact calculations, exceptions, and job-site requirements.
Ask Henri Now🧮
Smart Calculators
Henri uses this rule to automatically calculate wire sizing, voltage drop, and box fill.
🔍
Cross-Referenced
Instantly view how this rule interacts with Utility Manuals and Appendix B.
⚡️
Jobsite Ready
Accessible via mobile with offline caching capabilities for remote locations.