Canadian Electrical Code
Rule 8-102 1
8-102 Voltage drop
Voltage drop calculations must use the known connected load of the feeder or branch. If unknown, the calculation defaults to 80% of the overcurrent de...
Unlock the Full Rule Analysis
This rule has been fully audited and analyzed. Log in to ask Henri for exact calculations, exceptions, and job-site requirements.
Ask Henri Now🧮
Smart Calculators
Henri uses this rule to automatically calculate wire sizing, voltage drop, and box fill.
🔍
Cross-Referenced
Instantly view how this rule interacts with Utility Manuals and Appendix B.
⚡️
Jobsite Ready
Accessible via mobile with offline caching capabilities for remote locations.