Quebec Electrical Code
Appendix B - Rule 24-208
Testing of Three-Phase Isolated Systems
Three-phase isolated systems, along with any connected loads, should be subjected to periodic testing of the system's impedance-to-ground. An exceptio...
Unlock the Full Appendix
This appendix has been fully audited and analyzed. Log in to ask Henri for exact calculations, exceptions, and job-site requirements.
Ask Henri Now