Canadian Electrical Code
Rule 6-102 3
6-102 Number of supply services permitted
If two or more service boxes are installed but cannot be grouped as mandated by Subrule 2), a permanent diagram must be affixed at or adjacent to each...
Débloquez l'analyse complète de la règle
Cette règle a été entièrement auditée et analysée. Connectez-vous pour demander à Henri les calculs exacts, les exceptions et les exigences.
Demander à Henri🧮
Smart Calculators
Henri uses this rule to automatically calculate wire sizing, voltage drop, and box fill.
🔍
Cross-Referenced
Instantly view how this rule interacts with Utility Manuals and Appendix B.
⚡️
Jobsite Ready
Accessible via mobile with offline caching capabilities for remote locations.